GREENFIELD · NEW BUILD
From site to handover.
Planning from day one: work breakdown structure (WBS), schedule, budget as a baseline, progress measurement and forecast to complete. Every decision recorded, with who decided and why.
ARQUITETURAINTEGRADAORGANIZACIONAL
CLIENT PORTAL
Talk about a project
PROJECT MANAGEMENT · GREENFIELD & BROWNFIELD
We manage new builds and renovations across Brazil, including buildings that cannot stop, like hotels in operation. From the budget to the 3D model in a single ecosystem, with a portal where the owner follows everything, and people on site when the work calls for it.
AIO SHOWCASE · FICTIONAL BUILDING AND DATA · Drag to change the angle; use − and + for the rotation speed. Open full screen ↗
WHERE WE WORK
Both need the same care with schedule and cost. The second also needs respect for the people still using the building.
GREENFIELD · NEW BUILD
Planning from day one: work breakdown structure (WBS), schedule, budget as a baseline, progress measurement and forecast to complete. Every decision recorded, with who decided and why.
BROWNFIELD · RENOVATION & RETROFIT
Hotels, hospitals, offices and plants in operation: phases planned around the people using the building, a survey of what exists (facades, percussion testing) and progress followed area by area.
ONE ECOSYSTEM, ONE THREAD
The work breakdown structure (WBS) is born in the budget and moves from stage to stage without being retyped. What was budgeted becomes an activity, the activity becomes a region in 3D, and the client follows everything in the portal. Choose a stage to see what it does.
01 · BUDGET
The WBS and the bill of quantities form the baseline. Each item keeps direct cost separate from markup (BDI), and the risk of each assumption goes into the calculation, not into a rule-of-thumb percentage.
Hands over to stage 02: WBS and budget schedule
02 · PLANNING AND CONTROL
The schedule receives the WBS from the budget. During execution, each item gets sub-activities without losing its link to what was budgeted: at any time you can see what was budgeted, what was done, the extras and what was measured.
Hands over to stage 03: WBS and progress of each activity
03 · 3D MODEL (BIM)
The model receives the WBS and divides the building into regions. Each specific activity is tracked where it happens, with status and progress over time: that is 4D. Quantities come out of the model, with calculation records.
Hands over to stage 04: presentation, progress and mapping
04 · TRANSPARENCY PORTAL
An online ecosystem: the owner signs in with a code sent by e-mail and follows the progress of the work and of the suppliers, with nothing to install and no password. Read-only, with the source of every piece of information identified.
AVAILABLE already in use on projects IN DEVELOPMENT WITH CLIENTS built together with the people who will use it
TRACEABILITY
The same WBS code appears in all four stages. When someone asks “how much of this is done?”, there is only one answer.
Illustrative: sample item, quantities and percentages, no client data.
SEND YOUR DRAWINGS · IN DEVELOPMENT WITH CLIENTS
You send the design you already have. We model the building in BIM and link the model to the schedule. These are the formats we accept, from the most complete to the simplest:
IFC 2X3 OR IFC4
Exported from Revit, ArchiCAD or similar. It carries the most information: elements, levels and materials.
DXF · VERSION 2013 OR LATER
Exported from DWG, with the unit stated (cm or m), separate layers and external references bound into the file.
VECTOR PDF
Generated straight from CAD (not scanned), with scale and dimensions. One sheet per view.
PHOTOS AND SURVEY
For renovations without up-to-date drawings: photos by facade and room, site measurements and reports (such as the percussion test).
For now, files arrive by e-mail. Direct upload through the Client portal is being developed with our first clients.
THE AIO CHALLENGE
AIO set itself a challenge: every client request becomes an improvement to the platform in minutes or hours, depending on the request. A tweak to a screen takes minutes; a new feature, hours. No months-long queue, and response time measured and published here.
On any page of the platform, your company’s administrator taps “Ask AIO” and describes the change or the new feature.
The request arrives with the company, who asked and the page it came from. Nobody has to explain where it is.
The AIO team reviews the request and makes the change directly on the server, supported by artificial intelligence.
You get notified, see the status of the request and check the change on the same screen.
Target: minutes for tweaks, hours for new features. We will publish the average time for each type of request, to first reply and to completion, after the first 30 days of real requests.
IN DEVELOPMENT WITH CLIENTSHOW TO ENGAGE US
OWNER'S REPRESENTATIVE
You hire the contractors. We plan, follow, measure and report to you, independent enough to flag deviations in schedule, cost and quality.
SINGLE-CONTRACT DELIVERY
When it makes more sense, we take on the project: we hire and coordinate the specialists for each phase, and you deal with a single party from start to finish.
FOR CHAINS AND PORTFOLIOS
For hotel chains and companies with several properties: the same planning and reporting standard on every project, so you can compare properties and decide on the same basis.
Illustrative: progress of each property, measured the same way.
HOW WE WORK
Site visit, survey and a model of the building. In renovations, a map of what already exists.
WBS, schedule and procurement plan, agreed with you before work starts.
A daily remote routine, with field records and scheduled site visits.
The full history of the project: decisions, measurements and what was done, area by area.
LET'S TALK ABOUT YOUR PROJECT
We reply on WhatsApp or by e-mail, in English, Portuguese or German.
WhatsApp +55 (12) 99754-7177 · [email protected]